A pre-engineered 750 sq ft LivingStar SCIP panel ADU — built faster, stronger, and more energy-efficient than traditional stick frame. follow the button below and start your project estimate , then connect directly with our team.
Why Choose a SCIP Panel ADU?
SCIP (Structural Concrete Insulated Panels) ADUs offer a revolutionary approach to accessory dwelling unit construction. The LivingStar 750 sq ft floor plan is fully engineered, permit-ready, and designed specifically for Colorado Front Range conditions.
50% Faster Build
Pre-engineered panels arrive site-ready. Structural shell in days, not months.
R-24+ Insulation
Built-in EPS foam core delivers superior thermal performance for Colorado winters.
Cost-Competitive
Reduced labor hours and waste translate to competitive all-in pricing vs. stick frame.
Colorado Rated
Engineered for Colorado Springs seismic zone, wind loads, and snow loads.
Permit-Ready Plans
LivingStar-stamped drawings included. El Paso County compliant standard floor plan.
Rental Income Ready
Designed as a fully independent dwelling — full kitchen, bathroom, bedroom, and living area.
SCIP ADU Cost Estimator
Estimates are based on Colorado Springs market rates and LivingStar SCIP TIPS pricing. Final costs depend on site conditions, finish selections, and current material pricing. All estimates include standard SCIP panel package, labor, and permit fees.
Start Your Project — Get a Billdr Pro Quote
Fill out the form below to submit your project directly through our Billdr Pro project management system. Your information will populate a job form and connect you with a Coons Construction project coordinator within one business day.
How It Works: SCIP ADU Build Process
Site Assessment
We evaluate your property, zoning, setbacks, and utility access to confirm ADU feasibility.
Design & Permits
LivingStar-stamped drawings submitted to El Paso County / COS for permit approval.
Panel Fabrication
SCIP panels custom-cut and fabricated to your site specifications at the LivingStar facility.
Construction
Foundation, panel erection, shotcrete, MEP rough-in, and finish work — typically 90–120 days.
Ready to Build Your SCIP ADU?
The LivingStar 750 is the fastest path to a permitted, code-compliant ADU in Colorado Springs. Call us today or use the estimator above to get started.